View {title}

Hydropower plant

40,000,000 kWh/year of clean, renewable energy.

Via a pressure shaft approximately 2.5 km long with a drop of 837 meters, water from the Sanetsch reservoir flows into the Pelton turbine at the Innergsteig power station. With a nominal capacity of 18 MW, the turbine produces 40 GWh of clean, renewable electric power annually.

Stausee Sanetsch

Kraftwerk Sanetsch Ltd.

Kraftwerk Sanetsch Ltd. is a joint venture in which Energie Wasser Bern (ewb) and Bernische Kraftwerke (BKW Energie AG) each hold a 50% stake.

18 MW Peltonturbine